Power-Connect™
Data Center Site Qualification & MW Advancement

Power-Connect™ is Nexus’ standardized advancement framework for energy-adjacent land intended for AI and hyperscale data center development

The framework determines:

• Grid feasibility
• Scalable megawatt (MW) potential
• Infrastructure pathway alignment
• Institutional viability

 

Power-Connect™ converts early-stage feasibility signals into structured, decision-grade advancement outputs.

 

Phase I — Site Qualification

The qualification phase establishes whether a site meets the technical and locational thresholds required for data center deployment.

Scope of Assessment

Grid & Substation Context

  • Substation proximity analysis

  • Voltage level identification

  • Transmission network mapping

  • Grid operator jurisdiction review

Zoning & Environmental Screening

  • Planning designation review

  • Environmental constraint identification

  • Floodplain and protected zone screening

Campusability Assessment

  • Buildable footprint estimation

  • Indicative MW density modeling

  • Phasing potential analysis

Power-Connect™ Scorecard

  • Grid feasibility rating

  • Scalability index

  • Infrastructure complexity score

  • Institutional advancement potential

Deliverable

Structured Site Qualification Report including:

• Executive summary
• Technical findings
• MW capacity scenarios
• Advancement roadmap

 

Phase II — MW Advancement

Following qualification, the MW Advancement phase defines the technical pathway required to scale capacity and structure institutional readiness.

Technical Components

Interconnection Strategy

  • Utility engagement framework

  • Queue positioning strategy

  • Phased MW ramp pathway

Substation & Infrastructure Logic

  • Substation configuration modeling

  • Transformer pathway alignment

  • Switchgear sequencing overview

Energy System Alignment

  • BESS feasibility integration

  • Bridging power scenario evaluation

  • Energy architecture structuring

Campus Masterplanning

  • Hyperscale-ready layout logic

  • Substation positioning

  • Phased campus sequencing

Risk & Timeline Matrix

  • Interconnection risk mapping

  • Equipment risk assessment

  • Permitting complexity

  • Timeline sensitivity modeling

Deliverable

MW Advancement Framework including structured technical documentation supporting institutional review.